The Minute Maid Co.
Auburndale, FL
Excavation of Frozen Soil
Excavation of Frozen Soil New Sub Floor Warming System Replaced Deck/Insulation/Roofing
The Minute Maid Co.
Auburndale, FL
Excavation of Frozen Soil
|
PROJECT DESCRIPTION
| |
|
|
 |
Renovation
|
|
 |
Removal of
100,000 SF of Concrete Slab in Three Phases
|
|
 |
Removed and
Thawed up to 15 Feet of Frozen Soil, and Re-compacted the Soil
|
|
 |
-10 Degree
Freezer
|
|
 |
Under Floor
Glycol Warming System
|
|
 |
4-Inch Floor
Insulation
|
|
 |
6-Inch Finish
Slab
|
|
 |
Performed
Renovation While Maintaining the Structural Integrity of the
Building |
|
|